6. Machine Assembly

Step #15 - Routing the X & Z Cables

List of Components

ItemSpecQty
 AMB cable/1

Instructions

  1. Plug in the AMB spindle cable.
    1. Raise the Z axis to its maximum to ensure you have sufficient cable length.
      1. Take all the cables from the Z & X-axis and pass them through the cable chain.
        1. Once they are all through, you can clip together the cable male end of the X-axis gantry to the rest of the cable chain.
          1. Close each tabs of the cable chain.

            Make sure not to damage the cables.