2. Zone 4
- Home
- Documentation
- Vacuum Table
- Fab - Hurricane Pump
- Assembly Guide
- Zone 4
- Step #06 Mounting the Piping
Step #06 Mounting the Piping
Instructions
- Place the first half of the piping assembly into the bulkhead fittings.
- Tighten the bottom ring of the bulkhead fitting to ensure good sealing.
- Connect the second half to the piping collector and join the halves together.
Animation


