1. Assembling the Dust Shoe

Step #01 

List of Components

ItemSpecQty (S/M/L)
 Clamping ring 60PMMA1
 Clamping ring 54PMMA1
 Spindle partPMMA1
 Brush partPMMA1

Tools needed

-

Instructions

  1. Before any operations, remove the plastic protection of the the PMMA parts