1. FAB
Step #08 - Connecting the Two Pipes Sections
List of Components
Item | | Spec | Qty | |
---|
| Hose section | 5m | 2 | |
| Hose end cap | Steel | 2 | |
| Clamping Ring | Ø100 | 1 | |
| Quick lock collar | Ø100 | 2 | |
| Grounding cable | / | 2 | |
| Wire connector | 2 ways | 1 | |
Instructions
- At 20cm from the end of the flexible hose, with a box cutter, remove the plastic to expose the hose's copper wire.
- Repeat this step for the second hose section.
- Connect the grounding wires on the exposed metal on both sections.
- Insert the steel end caps in both hose section's ends.
- Tighten the clamping ring on both hose sections.
- Bend the wires to run parallel (see picture).
- Place the quick-lock collar on one hose's end. Pass one of the copper wires through (see picture)
- Insert the second hose in the quick-lock collar. Make sure the rubber is correctly placed around it.
- Close the quick-lock collar latch.
- Connect the wires in the wire connector.