9. Cable Management

Step #12 - Connecting the Y-axis Limit Sensors

List of Components

ItemSpecQty (S/M/L)
 Sensor cable Y1- (green)180cm1
 Sensor cable Y1+ (green)330cm1
 Sensor cable Y2- (yellow)270cm1
 Cable tie-2

Tools needed

-

Instructions

  1. Connect each cable to their respective sensor.
    1. The sensor cables for the Y1-axis are green, while the sensor cable for the Y2-axis is yellow.
      1. Firmly insert the Y1- and Y2- sensor cables inside the cable fixtures located at the front of the machine.
        1. Put the cables inside the left and right vertical trunking.
          1. Use the cable tray to lay the Y1+ sensor cable and secure its position using 2 cable ties.

            Drawing

            You can use the PMMA assembly gauge to help you insert the cables inside the cable fixtures.