3. Zone 3

Step #01 Assembling the Pipe 1/2

List of Components

ItemSpecQty
 Pipe sectionØ50/680mm1
 Pipe sectionØ50/110mm1
 Pipe sectionØ50/90mm2
 Pipe T-connectorØ50mm1
 Pipe 90° connectorØ50mm2

Tools needed

Measuring Tape

Instructions

  1. Slide the T-connector in the 680mm tube section.
    1. On the other end of the pipe, add the 90° connector.
      1. Add the two 90mm pipes in the connectors.
        1. Slide the 110mm pipe in the T-connector.
          1. Add the last 90° connector.
            Use liquid soap to ease the pipe assembly.

            Animation