2. Facing & Drilling The Spoilerboard

Step #03

Tools needed

Spanner 17mm (AMB) Spanner 22mm & 30mm (VFD)

Instructions

  1. Remove the endmill in place.
    1. Place the 8mm collet inside the clamping nut and insert the 25mm endmill.
      1. Tighten the clamping nut with the spanner