10. Machine Connection & First Run

Step #02 - Connecting the Control Unit

List of Components

ItemSpecQty (S/M/L)
 Control unit-1

Tools needed

-

Instructions

  1. Place the control unit under the machine, at the front.
    1. Plug all the cables as instructed on the drawing above.

      Drawing