9. Cable Chain Management

Step #05 - Fixing the Cable Chains

List of Components

ItemSpecQty
 Cable chain (step #04)1900mm1
 Cable chain1200mm1
 DIN912 screwM5x164
 LocknutM54
 DIN9021 washerM58
 Cable tie-4

Tools needed

Allen Key 4mm Spanner 8mm

Instructions

  1. Take the 1900mm cable chain that you assembled in the previous step and place it on the Y-axis cable tray.
    1. Attach it to the cable chain holder, using 2 screws, 2 locknuts and 2 washers.
      1. Secure its position on the cable tray using 2 cable ties.
        1. Place the 1200mm cable chain on the X-axis cable tray and attach it to the cable chain holder using the 2 screws, 2 locknuts and 2 washers.
          1. Secure its position on the cable tray using 2 cable ties.

            Animation

            To firmly attach the cable chain, use the cable ties as shown in the pictures below.