11. Machine Connection & First Run

Step #01 - Connecting the Control Unit

List of Components

ItemSpecQty (S/M/L)
 Control unit-1

Tools needed

-

Instructions

  1. Place the control unit at the front left of the machine, it should sit tight in between the 2 lower profiles.
    1. Plug all the cables as instructed on the drawing above.