6. Machine Assembly

Step #05 - Placing the Y2-Sensor Cable

List of Components

ItemSpecQty
 Y2 Sensor cableYellow1
 Cable tie/1

Tools needed

Cutting pliers EVO Gauge

Instructions

  1. Plug the yellow cable into the Y2-axis (front/bottom) sensor. Plug the top & bottom pins. The middle pin must remain unplugged.
    1. Add the cable-tie as shown on the schematic. Cut the excess off.
      Only the top and bottom pins from the limit switch must be plugged. The middle one must remain empty.