6. Machine Assembly

Step #02 - Placing the Z-Sensor Cable

List of Components

ItemSpecQty
 Z-sensor cableBlue1
 Cable tie/1

Tools needed

Cutting pliers EVO Gauge

Instructions

  1. Plug the blue cable into the Z-axis (up/down) sensor.
    1. Plug the top & bottom pins only. Use the EVO gauge to help you insert it.
      1. Pass the cable-tie through as shown on the schematic. Cut the excess off.
        Only the top and bottom pins from the limit switch must be plugged. The middle one must remain empty.